Permit path
Equipment replacement, relocation, duct modifications, and a new system can follow different review paths. Confirm mechanical and associated electrical scope.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Equipment replacement, relocation, duct modifications, and a new system can follow different review paths. Confirm mechanical and associated electrical scope.
Equipment schedule and location; existing/proposed system information; duct or sizing documents where required; mounting and electrical information.
Mechanical rough-in where applicable, checks before concealed work is covered, and mechanical/electrical finals as required by the permit.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.