THE SCOPE / THE PERMIT / THE INSPECTIONS

Solar Permit Coordination

Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.

01

Permit path

Coordinate roof/structural and electrical review along with utility interconnection. Permit approval and utility authorization are distinct milestones.

02

Requirements to prepare

Array layout; mounting documents; electrical plans and equipment information; service verification; structural and utility documents required for the project.

03

Inspection milestones

Building/structural and electrical inspections as assigned. Confirm utility steps separately before treating the system as authorized to operate.

Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.

Sources reviewed October 20, 2026. Confirm current local requirements before applying.