Permit path
Coordinate roof/structural and electrical review along with utility interconnection. Permit approval and utility authorization are distinct milestones.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Coordinate roof/structural and electrical review along with utility interconnection. Permit approval and utility authorization are distinct milestones.
Array layout; mounting documents; electrical plans and equipment information; service verification; structural and utility documents required for the project.
Building/structural and electrical inspections as assigned. Confirm utility steps separately before treating the system as authorized to operate.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.