Permit path
Coordinate zoning/site review, the building permit, and applicable trade or agency approvals. A new building is a coordinated package, not a single form.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Coordinate zoning/site review, the building permit, and applicable trade or agency approvals. A new building is a coordinated package, not a single form.
Survey/site plan; architectural and structural plans; MEP and energy documents; product approvals; contractor records; agency documents required for the property.
Site/foundation, structural stages, trade rough-ins, and finals as assigned. Track outstanding agency requirements and CO/CC eligibility separately from individual passed inspections.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.